Costs
All amounts in LKR. Add one row per purchase. Keep the receipt number when there is one.
Purchases
| # | Date | Item | Details | Qty | Unit price | Total | Place | Receipt |
|---|---|---|---|---|---|---|---|---|
| 1 | 2026-08-31 | Coconut seedlings | Type on the papers: PP PB, class සාමාන්ය (ordinary). Season 2026 Yala. | 3 | 550 | 1,650 | Coconut Cultivation Board, Eraminigolla | Cash receipt no. 1222070 |
| 2 | 2026-09-05 | Compost fertilizer | 40 kg bag. Used when filling the holes of P01 and P02. No receipt kept. | 1 | 1,500 | 1,500 | Fertilizer shop in the market (name not known) | - |
| 3 | 2026-09-07 | Hole digging | Excavator hired to dig the planting holes. 1.5 hours of work. | 1.5 h | 3,300 / h | 4,950 | Home garden | - |
| 4 | 2026-09-07 | Coconut husks | About 300 husks. The 1,000 was one payment for the husks and the transport. | ~300 | - | 1,000 | From Anuradha, brought by him | - |
| 5 | 2026-09-09 | Alkathene pipe | 200 feet. To carry waste water from the bathroom and the kitchen to the plants. | 200 ft | 24 / ft | 4,800 | not written down | - |
| 6 | 2026-09-09 | Pipe sockets and fittings | Sockets and other small parts for the waste water line. | 1 lot | - | 4,235 | not written down | - |
| 7 | 2026-09-16 | YPM-W | Young palm mixture, wet zone. 2.5 kg = 1,250 g x 2 plants, the amount the guide gives per hole. Bought for the two next plants. | 2.5 kg | 220 / kg | 550 | not written down | - |
| 8 | 2026-09-16 | Dolomite | 2 kg = 1 kg x 2 plants, the amount the guide gives per hole. Bought for the two next plants. | 2 kg | 20 / kg | 40 | not written down | - |
| 9 | 2026-09-16 | Compost fertilizer | Second 40 kg bag. For the two next plants. Same price as the first bag (row 2). | 1 | 1,500 | 1,500 | not written down | - |
| 10 | 2026-09-16 | Pipe equipment | Sockets, tap & stuff for watering coconut seedlings. | 1 lot | - | 3,375 | not written down | - |
| 11 | 2026-10-?? | Coconut seedlings | Ordered from Pradeep, Deliwala Agrarian Development Officer. Expected next month. | 2 | 400 | 800 | Deliwala | - |
Total so far: 24,400
Cost by category
| Category | Total |
|---|---|
| Seedlings | 2,450 |
| Land / hole digging | 4,950 |
| Organic fertilizer | 3,000 |
| YPM / dolomite | 590 |
| Coconut husks | 1,000 |
| Water / irrigation | 12,410 |
| Tools | 0 |
| Transport | 0 |
| Labour | 0 |
| Other | 0 |
| All | 24,400 |
Papers
Cash receipt no. 1222070 — 2026-08-31

Reason line: PP PB පැළ 3 x 550/= 1650/=. Total Rs. 1650/=.
Seedling handover form no. 306569 — 2026-08-31

පොල් පැළ භාරදීමේ පත්රය (coconut seedling handover form) of the Coconut Cultivation
Board.
| Field | Value |
|---|---|
| Place | Eraminigolla |
| Season | 2026 Yala |
| Seedling type | PP PB |
| Issue notice no. / regional office | 1222070 |
| Amount paid | 1650/= |
| Purpose (row 10.3) | අළුතින් පොල් වගා කිරීමට — new coconut planting |
| Number of seedlings | 3 |
| Class ticked | සාමාන්ය (ordinary), not a උස x උස or කුරුඳා x උස cross |
Rules printed on the form:
- The board sells seedlings under a subsidy. The subsidy is about 1/3 of the production cost.
- This form must be filled and handed over when buying seedlings, and also when asking for any other coconut planting subsidy.
- Seedlings must not be resold without permission from the board.
- Get the technical advice, subsidy and loan details before buying seedlings.
Notes
- The compost bag (row 2) was bought from a fertilizer shop in the market. Write down the shop name on the next visit, so the price can be compared later.
- The pipe and the fittings (rows 5 and 6) are for the waste water line. The shop name was not written down. Write it here on the next visit.
- The YPM-W, the dolomite and the second compost bag (rows 7, 8 and 9) were bought for two more plants that are not bought yet. The shop names were not written down. Write them here on the next visit.
- The YPM and the dolomite used on
P01,P02andP03were never entered here — the price and the amount are not known. Find out and add a row for them. PBmost likely means polybag — the same letters are printed above the seedling type table on the handover form.PPis still not confirmed. Ask the Eraminigolla office and write the answer here.- Update Total so far and the category table every time a row is added, and update the Spent so far row in the section landing page.